A Day of Firsts

Our Kismet finally feels the fresh northwest air, goes for a truck ride, touches water, gets its top put on and its engine started – all on a rare, for the Pacific Northwest, sunny and warm, February day.

splashday 0032 A Day of Firstssplashday 0043 A Day of Firstssplashday 0066 A Day of Firsts 

We arrived at the Fathom plant at 8a.m. just in time to watch our boat being loaded onto the trailer, which is used to haul boats to the launch site. As the boat peeked out of its womb for the very first time the truck stopped so that all the Fathom craftspeople could pose for a photo op next to our boat. These are the talented people who made it all come together in just three-and-a-half months.

 splash day 0039 A Day of Firsts

After a short truck ride to the launch site a large travel lift is positioned over the boat to lift it off of the trailer. It’s then moved into position over the well before being lowered into the water for the first time. Then the fly bridge is lowered into place by a boom. Shortly after the technicians installed the safety rails, ran the engine and generator for the first time, tested both thrusters, and engaged the transmission into forward and reverse and more. It was a fun day with Ric grabbing burgers from town as we all shared lunch on the fly bridge with the sun keeping us warm.

The pieces have all come together into a beautiful boat and we could not be more pleased. 

splashday 0079 A Day of Firstssplashday 0083 A Day of Firstssplashday 0094 A Day of Firstssplashday 0102 A Day of Firstssplashday 0110 A Day of Firstssplashday 0127 A Day of Firstssplashday 0128 A Day of Firstssplashday 0129 A Day of Firstssplashday 0151 A Day of Firstssplashday 0142 A Day of Firsts

Related posts:

  1. All Packed Up – Heading Out West
  2. Monday is the Day!
  3. Here We Go Again
  4. Trent Severn Waterway – Lock Wall in Gamebridge, Canada
  5. Seattle Boat Show
  6. More Progress on Kismet

One Comment

Leave a Comment